Energetics

Facility Client Scope of work
Year of completion
References scan
Turów Power Plant Budimex S.A., Tecnicas Reunidas S.A. - Turów Spółka Cywilna Delivery and assembly of heating, ventilation and air conditioning systems (HVAC) 2017-2019
Opole Power Plant Mostostal Power Development Sp. z o.o. 6UED Carbon Conveyors Gallery - water and sewerage system 2017
Opole Power Plant GE POWER Sp. z o.o. Units no 5 and 6 - execution of heating, ventilation and air conditioning systems (HVAC) with control for Engine Room 2015-2019
Opole Power Plant Polimex Opole
Sp. z o.o. Sp. K.
HVAC system - Package S.10.2 2016-2019
Opole Power Plant Mostostal Power Development Sp. z o.o. execution of sanitary systems in pylons 2015-2018
Opole Power Plant Mostostal Power Development Sp. z o.o. roof surface drainage system 2016-2017
Rybnik Power Plan Energy Management
and Conservation Agency S.A
execution of HVAC system 2015-2016
Kozienice Power Plant Polimex-
Mostostal S.A.
execution of central heating, ventilation and air conditioning systems (HVAC) with control automatics for HVAC system in coal handling units 2016
Opole Power Plant - Units no 5 and 6 ALSTOM Power Sp. z o.o. Execution of heating, ventilation and air conditioning systems (HVAC) with control for Engine Room 2015-2019
Bydgoszcz Cogeneration Plant ALSTOM Power Sp. z o.o. Execution of heating, ventilation and air conditioning systems 2015
Orlen Wloclawek Power Plant SNC - Lavalin
Polska Sp. z o.o.
installation of intake and exhaust mechanical ventilation, air conditioning systems, heating systems, instrumentation system, ventilation, air conditioning and heating in the building of electrical substation with block control room, execution of ventilation installation of Gas Turbine and Generator, HVAC and Heating Instalations in Main Building, Water and Sewage Installations in Main Building, implementation of HVAC and heating system in the building of gas reduction & measuring station with boiler room, installation of additional heater in the cooling water pumping station building, complete execution of HVAC and instrumentation for water pumping station buildings, complete execution of sprinkler installation of the turbine set oil position. 2014-2015
Administrative Building Orlen Włocławek - AGMET Sp. z o.o. complete performance of ventilation system, air conditioning and smoke removal, heating system, instrumentation of ventilation, air conditioning and heating in the administrative building 2014-2015
Kozienice Power Plant Polimex-Mostostal S.A. complete performance of water and sewage system and HVAC in communication pylons 2014
Bełchatów Power Plant SANDVIK Mining
and Construction - Tychy
coal supply system for the 858 MW power unit 2009-2012
Kozienice Power Plant KOZIENICE POWER PLANT SA rebuild of the fire extinguishing collecting pipe 2011
Kozienice Power Plant KOZIENICE POWER PLANT SA rebuild of the fire extinguishing collecting pipe in the machinery room of the power unit No. 10 2011
Bełchatów Power Plant ALSTOM POWER Warsaw fabrication, supply, installation and start-up of complete heating, ventilation and desmoking system for the boiler house at the 858 MW power unit 2008-2011 pdf_icon
PĄTNÓW II Power Plant SNC – Lavalin - Warszawa main building of the 460 MW power unit – a turnkey central heating and water/sewage system, turnkey ventilation, desmoking and air conditioning systems, turnkey internal and fire extinguishing systems for buildings A1-2, A1-3, A2, A10, A6, A6-2, A4 2006-2008 pdf_icon
PĄTNÓW II Power Plant – Konin CHOVET -
Warszawa
ignition oil system 2006-2007
ECB cogeneration plant – Biłgoraj BRW – Biłgoraj insulation works 2004-2005
ECB cogeneration plant – Biłgoraj BLACK RED
WHITE - Biłgoraj
mechanical ventilation and generator ventilation systems 2003
ECB cogeneration plant – Biłgoraj ICS Polska -
Wrocław
insulation of pipelines, devices and fittings, start-up preparation of the cogeneration plant 2003
Wrotków cogeneration plant – Lublin BWT Polska -
Warszawa
installation of a new water demineralizing station 2001-2002
Kozienice Power Plant ZRE –
Świerże Górne
replacement of D406x8 pipeline from the PB1 – 440 m 2001-2002
Kozienice Power Plant BESTACO –
Świerże
FGDP dump place – installation works 2001
Kozienice Power Plant Kozienice Power Plant Modernization of ash removal system from the 2nd run of the boiler No. 6, Modernization of ash removal system from the 2nd run of the boiler No. 7, Modernization of return water collecting pipes, Modernization of ash removal system from the 2nd run of the boiler No. 9, Modernization of swithgear and battery plant 2001
Kozienice Power Plant FORTUM
Eng. Polska
flue gas desulphurization system 2000
Kozienice Power Plant Kozienice Power Plant Discharge of contaminated water from the FGDP to the Vistula river, pressurized sanitary sewage system with a pump station from the gypsum storage place at the Power Plant. Construction of overflow wells D 2220 mm at the field No. 5 – slag and ash dump place 2000  pdf_icon
Kozienice Power Plant Kozienice Power Plant, Świerże Górne Condensate treatment station – 1st stage – installation & assembly works. Replacement of hydraulic transportation pipelines from the PB-2, Replacement of pipelines D 406x8,0. Relocation of pulp pipelines D 406. Modernization of return water collecting pipes to the PB3 power unit 10. Systems in the coal supply conveyor. Fire extinguishing water system in the generator and boiler house of power unit 10 2000  pdf_icon
Kozienice Power Plant FORTUM
Eng. Polska -Warsaw
Supply and installation of tanks and piping for the WWTP at the Kozienice Power Plant 1999-2000
Kozienice Power Plant KOZIENICE POWER PLANT SA Construction of overflow wells D 2220 at the field No. 4, modernization of the fire extinguishing system 1998
Kozienice Power Plant „BESTACO” -
Świerże Górne
Modernization of rainwater and industrial wastewater treatment plant of power units 8x200 MW at the Kozienice Power Plant 1997 -1998
„Połaniec” Power Plant Energomontaż-
Północ Warsaw
flue gas desulphurization system 168 000 m3 1997
EC Lublin Wrotków cogeneration plant EC Lublin Wrotków cogeneration plant Rebuild and modernization of ventilation and air conditioning system at the control room of the Lublin Wrotków cogeneration plant - 4 400 m3 1995
Kozienice Power Plant Kozienice Power Plant, Świerże Górne Pressurized collecting pipe „Vertical drainage pipe 2x500 MW” at the Kozienice Power Plant 1995