Delivery and assembly of heating, ventilation and air conditioning systems (HVAC)
2017-2019
Opole Power Plant
Mostostal Power Development Sp. z o.o.
6UED Carbon Conveyors Gallery - water and sewerage system
2017
Opole Power Plant
GE POWER Sp. z o.o.
Units no 5 and 6 - execution of heating, ventilation and air conditioning systems (HVAC) with control for Engine Room
2015-2019
Opole Power Plant
Polimex Opole
Sp. z o.o. Sp. K.
HVAC system - Package S.10.2
2016-2019
Opole Power Plant
Mostostal Power Development Sp. z o.o.
execution of sanitary systems in pylons
2015-2018
Opole Power Plant
Mostostal Power Development Sp. z o.o.
roof surface drainage system
2016-2017
Rybnik Power Plan
Energy Management
and Conservation Agency S.A
execution of HVAC system
2015-2016
Kozienice Power Plant
Polimex-
Mostostal S.A.
execution of central heating, ventilation and air conditioning systems (HVAC) with control automatics for HVAC system in coal handling units
2016
Opole Power Plant - Units no 5 and 6
ALSTOM Power Sp. z o.o.
Execution of heating, ventilation and air conditioning systems (HVAC) with control for Engine Room
2015-2019
Bydgoszcz Cogeneration Plant
ALSTOM Power Sp. z o.o.
Execution of heating, ventilation and air conditioning systems
2015
Orlen Wloclawek Power Plant
SNC - Lavalin
Polska Sp. z o.o.
installation of intake and exhaust mechanical ventilation, air conditioning systems, heating systems, instrumentation system, ventilation, air conditioning and heating in the building of electrical substation with block control room, execution of ventilation installation of Gas Turbine and Generator, HVAC and Heating Instalations in Main Building, Water and Sewage Installations in Main Building, implementation of HVAC and heating system in the building of gas reduction & measuring station with boiler room, installation of additional heater in the cooling water pumping station building, complete execution of HVAC and instrumentation for water pumping station buildings, complete execution of sprinkler installation of the turbine set oil position.
2014-2015
Administrative Building Orlen Włocławek -
AGMET Sp. z o.o.
complete performance of ventilation system, air conditioning and smoke removal, heating system, instrumentation of ventilation, air conditioning and heating in the administrative building
2014-2015
Kozienice Power Plant
Polimex-Mostostal S.A.
complete performance of water and sewage system and HVAC in communication pylons
2014
Bełchatów Power Plant
SANDVIK Mining
and Construction - Tychy
coal supply system for the 858 MW power unit
2009-2012
Kozienice Power Plant
KOZIENICE POWER PLANT SA
rebuild of the fire extinguishing collecting pipe
2011
Kozienice Power Plant
KOZIENICE POWER PLANT SA
rebuild of the fire extinguishing collecting pipe in the machinery room of the power unit No. 10
2011
Bełchatów Power Plant
ALSTOM POWER Warsaw
fabrication, supply, installation and start-up of complete heating, ventilation and desmoking system for the boiler house at the 858 MW power unit
2008-2011
PĄTNÓW II Power Plant
SNC – Lavalin - Warszawa
main building of the 460 MW power unit – a turnkey central heating and water/sewage system, turnkey ventilation, desmoking and air conditioning systems, turnkey internal and fire extinguishing systems for buildings A1-2, A1-3, A2, A10, A6, A6-2, A4
2006-2008
PĄTNÓW II Power Plant – Konin
CHOVET -
Warszawa
ignition oil system
2006-2007
ECB cogeneration plant – Biłgoraj
BRW – Biłgoraj
insulation works
2004-2005
ECB cogeneration plant – Biłgoraj
BLACK RED
WHITE - Biłgoraj
mechanical ventilation and generator ventilation systems
2003
ECB cogeneration plant – Biłgoraj
ICS Polska -
Wrocław
insulation of pipelines, devices and fittings, start-up preparation of the cogeneration plant
2003
Wrotków cogeneration plant – Lublin
BWT Polska -
Warszawa
installation of a new water demineralizing station
2001-2002
Kozienice Power Plant
ZRE –
Świerże Górne
replacement of D406x8 pipeline from the PB1 – 440 m
2001-2002
Kozienice Power Plant
BESTACO –
Świerże
FGDP dump place – installation works
2001
Kozienice Power Plant
Kozienice Power Plant
Modernization of ash removal system from the 2nd run of the boiler No. 6, Modernization of ash removal system from the 2nd run of the boiler No. 7, Modernization of return water collecting pipes, Modernization of ash removal system from the 2nd run of the boiler No. 9, Modernization of swithgear and battery plant
2001
Kozienice Power Plant
FORTUM
Eng. Polska
flue gas desulphurization system
2000
Kozienice Power Plant
Kozienice Power Plant
Discharge of contaminated water from the FGDP to the Vistula river, pressurized sanitary sewage system with a pump station from the gypsum storage place at the Power Plant. Construction of overflow wells D 2220 mm at the field No. 5 – slag and ash dump place
2000
Kozienice Power Plant
Kozienice Power Plant, Świerże Górne
Condensate treatment station – 1st stage – installation & assembly works. Replacement of hydraulic transportation pipelines from the PB-2, Replacement of pipelines D 406x8,0. Relocation of pulp pipelines D 406. Modernization of return water collecting pipes to the PB3 power unit 10. Systems in the coal supply conveyor. Fire extinguishing water system in the generator and boiler house of power unit 10
2000
Kozienice Power Plant
FORTUM
Eng. Polska -Warsaw
Supply and installation of tanks and piping for the WWTP at the Kozienice Power Plant
1999-2000
Kozienice Power Plant
KOZIENICE POWER PLANT SA
Construction of overflow wells D 2220 at the field No. 4, modernization of the fire extinguishing system
1998
Kozienice Power Plant
„BESTACO” -
Świerże Górne
Modernization of rainwater and industrial wastewater treatment plant of power units 8x200 MW at the Kozienice Power Plant
1997 -1998
„Połaniec” Power Plant
Energomontaż-
Północ Warsaw
flue gas desulphurization system 168 000 m3
1997
EC Lublin Wrotków cogeneration plant
EC Lublin Wrotków cogeneration plant
Rebuild and modernization of ventilation and air conditioning system at the control room of the Lublin Wrotków cogeneration plant - 4 400 m3
1995
Kozienice Power Plant
Kozienice Power Plant, Świerże Górne
Pressurized collecting pipe „Vertical drainage pipe 2x500 MW” at the Kozienice Power Plant
1995